Published on Mar 8, 2015


Chris Fietzer shows step by step how to build a portable worm casting separator and compost sifter for under $75 and then does a quick demo at the end of the video. Detailed purchase list and cut listing are broken out below. If you like this video, be sure to leave a comment or give a thumbs up.

Subscribe for future videos:
https://www.youtube.com/subscription_c...

PURCHASE LIST:
(paint section)
4 - Five gallon buckets

(bldg materials)
1 - roll 1/2 inch mesh that is 24" wide (need 40 inches in length minimum)
1 - roll 1/4 inch mesh that is 24" wide (if using additional screen sizes)
1 - roll 1/8 inch mesh that is 24" wide (if using additional screen sizes)

(plumbing)
10 - 1 inch PVC 90 degree elbows
9 - 1 inch PVC Tee fittings
5 - 1 inch PVC end caps
4 - 1 inch PVC pipe 10 foot lengths
2 - 1 inch PVC 45 degree fittings
1 - 1 inch PVC cross fitting (4-way cross)
1 - 1 inch PVC coupling
1 - 1 1/4 inch PVC pipe 5 foot length
1 - bottle PVC Primer (clear looks neater)
1 - bottle PVC Cement

(hardware)
8 - #8-32 x 1/2 inch machine screws w/nuts
8 - #8 fender washers
15 - #10-24 x 2 inch machine screws w/nuts (option - 4 of these are used for legs)
5 - #10-24 wing nuts (option - 4 are used for legs and 1 is used for axle)
6 - #10 fender washers
1 - 1/4-20 all thread (need 26 inches minimum)
12 - 1/4-20 lock nuts
8 - 1/4 inch washers
2 - 48 inch bungee cords (optional - needed if using additional screen sizes)
2 - small caribeener for bungee cords (optional - needed if using additional screen sizes)

(electrical)
1 - bag 8 inch black UV stabilized wire ties (zip ties - need 10-15 ties total)

(tools)
1 - 1 3/8 inch hole saw with arbor


CUT LIST:
--1 INCH PVC PIPE--
2 @ 13 1/2 inches (cross leg supports)
10 @ 6 inches (handle and chassis corners)
1 @ 41 1/2 inches (axle)
2 @ 29 inches (chassis sides)
12 @ 3 inches (leg feet and chassis leg slip nipples)
2 @ 21 inches (infeed legs)
2 @ 24 1/2 inches (outfeed legs)
2 @ 2 inches (outfeed leg 45 degree nipples
1 @ 7 inch (portion of handle that gets screwed to axle coupling)

--1 1/4 INCH PVC PIPE--
4 @ 6 inches (Legs slip attachment fittings)
1 @ 3 7/8 inches (handle spinner)

--BUCKETS--
2 @ 7 inches from top rim
2 @ remove bottoms and cut lengthwise

--SCREENS--
1 @ 40 inches long for each size mesh


PARTS BY COMPONENT:
--INFEED LEG--
4 - 1 inch PVC @ 3 inches (feet)
2 - 1 inch PVC @ 21 inches (legs)
1 - 1 inch PVC @ 13 1/2 inches (cross leg support)
2 - 1 inch PVC end caps
2 - 1 inch PVC 90 degree elbows
2 - 1 inch PVC Tee fittings
2 - #10-24 2 inch machine screws w/nuts
4 - #10 machine screw washers

--OUTFEED LEG--
4 - 1 inch PVC @ 3 inches (feet)
2 - 1 inch PVC @ 24 1/2 inches (legs)
1 - 1 inch PVC @ 13 1/2 inches (cross leg support)
2 - 1 inch PVC end caps
2 - 1 inch PVC 90 degree elbows
2 - 1 inch PVC Tee fittings
2 - #10-24 2 inch machine screws w/nuts
4 - #10 machine screw washers

--CHASSIS--
8 - 1 inch PVC @ 6 inches (corners)
4 - 1 inch PVC @ 3 inches (nipples between 45 degree and 1 1/4 inch leg slip)
4 - 1 1/4 inch PVC @ 6 inches (leg slips)
2 - 1 inch PVC @ 2 inches (nipples between chassis leg Tee and 45 degree)
2 - 1 inch PVC @ 29 inches (sides)
4 - 1 inch PVC 90 degree elbows
4 - 1 inch PVC Tee fittings
2 - 1 inch PVC 45 degree elbows
1 - 1 inch PVC Tee fitting drilled for axle
1 - 1 inch PVC Cross fitting drilled for axle
11 - #10-24 2 inch machine screws w/nuts
16 - #10 machine screws washers
6 - #10 fender washers
1 - bag of 8 inch black UV stabilized wire ties (zip ties)

--HANDLE, AXLE, & SCREEN--
2 - 1 inch PVC @ 6 inches (handle)
1 - 1 inch PVC @ 41 1/2 inches (axle)
1 - 1 inch PVC @ 7 inches (length that connect handle to axle coupling)
1 - 1 1/4 inch PVC @ 3 7/8 inches (handle spinner)
1 - 1 inch PVC end cap
2 - 1 inch PVC 90 degree elbows
1 - 1 inch PVC coupling
2 - #10-24 2 inch machine screws w/nuts
4 - #10 machine screw washers
8 - #8-32 x 1/2 inch machine screws w/nuts
8 - #8 fender washers
1 - 1/4-20 all thread (need 26 inches min)
12 - 1/4-20 lock nuts
8 - 1/4 inch washers
2 - 48 inch bungee cords (if using additional screen sizes)
2 - small caribiner for bungee cords (if using additional screen sizes)
1 - 1/2 inch mesh 24 inches wide @ 40 inches long (for each size mesh)


TOOLS USED:
- miter saw (or pvc cutter)
- hack saw with metal cutting blade (could use jigsaw as well)
- tin snips or heavy duty scissors
- wire cutters
- tape measure
- 1 3/8 inch hole saw with arbor
- 3/8 inch drill
- 1/4 inch drill bit for all hardware except all thread
- 5/16 inch drill bit for 1/4 inch all thread pilot holes
- phillips screwdriver
- 7/16 inch wrench
- 3/8 inch wrench
- 7/16 inch socket and ratchet
- needlenose pliers
- vise grips (used while putting lock nuts on)
- tape
- dremel
- sandpaper

Big Shout Out to Mike Laine's design. Check his YouTube Channel: https://www.youtube.com/watch?v=q7yJ6...

His original plans:
http://mlaine.homeip.net/Trom


Category
Howto & Style
 

License
Standard YouTube License
 

You need to be a member of Goldprospectorsspace to add comments!

Join Goldprospectorsspace

Email me when people reply –

Replies

  • this is how it copied out TIM G . going thru links,plans etc I have ran into over the years and trying to add them in here for every one . and only fair to post how and where they came from. :) As the saying goes give credit to where credit is due.

    • I agree thanks for sharing 

This reply was deleted.